Friday, October 23, 2009
The East entrance. I got a layer of cement to cover from the frame work, around the corner to the tires. I still need to finish the rest of the way around the door. The corners and door frame edges are hard to make nice, but it's coming along. The tire retaining wall will go two more tiers and then a bond beam on top. A few years from now, I may continue the greenhouse to the East end. I'll collect water from the added roof into a tank behind the tires and gravity feed into a garden hose inside. This will be a totally separate greenhouse planter system from the original house (although connected by the entry). It should provide a 20 x 5 feet planter/walkway space for more veggys-yum!